Scirocco 6kW with lighting option for Telecom application (Sweden) |
|
|
|
|
|||||
|
6kW extreme conditions testing WT (BJRE Ltd - Kirkwall - Orkney island - Scotland) Annual average wind speed : 11 m/s at 50m Scirocco's energy production at Orkney : 22,000 to 28,000 kw.h/y more infos at www.bjre.co.uk |
|||||
|
Video 1 (0.93Mo) |
![]() |
||||
| Video 2 (0.90Mo) |
![]() |
||||
| Video 3 (0.88Mo) |
![]() |
||||
|
||
|
|
|
|
|||||||
|
|||||||
|
|||||||
|
|||||||
|
|||||||
|
Montana (USA - installer Pine Ridge) - 1 Scirocco (right side) + 24m guyed tower + 6kW grid tied inverter |
|||||||
|
|
|||||||
|
Algeria (University of Batna - installer ESLI) - Scirocco + 18m guyed tower + MWI |
|||||||
|
|
|||||||
|
Germany (installer Terrawatt) - Hybrid station - PV + Scirocco + MWI |
|||||||
![]() |
|||||||
|
Germany (installer Hawi) - Scirocco + Aurora grid inverter + 18m guyed tower |
|||||||
![]() |
|||||||
|
Engineering details |
|||||||
|
Hollowtech fiberglass blade - Eoltec's custom design -
|
|
6 kW Direct Drive Generator - Ø70mm steel oversized shaft |
|
|
|
|
|
|
Centrifugal pitch control sealed mechanism blade's slewing rings |
|
![]() |
|
![]() |
|
|
Rotating electric collector standard) - brake's remote command (option) |
|
![]() |
|
|
5.5 to 6kW DSP controlled electronic converters (6kW grid Inverter, 6kW heater controller, 5.5kW "PV-wind-batt-grid inverter") |
|
|
|
|
|
Eoltec 2009 |
all rights reserved - subject to possible modifications - |